Elevator Modernization Plan
As critical facility assets, elevators are part of an extensive planning and budgeting process for preventative maintenance, as well as upgrades and gradual replacement of our older elevators and infrastructure. TMUs elevators range from 45 years old to brand-new installations and our community has been growing with more people than ever using our facilities.
The Elevator Modernization Plan is an initiative by Facilities Management and Development (Facilities) to improve elevator service and reliability. A study to evaluate our elevators, escalators and other lifting devices was completed in 2019:
- Twenty two elevators were assessed and identified as requiring modernization to upgrade obsolete parts that are no longer manufactured and are difficult to replace or upgrade.
- Sixty-four elevators, escalators and other lifts were assessed as being in good working condition and remain on a regular preventative maintenance regime to maximize their life expectancies.
In partnership with an external elevator consultant and elevator service providers, Facilities developed an action plan that prioritizes our oldest elevators and sole-elevator buildings for upgrades or replacement, while enhancing preventative maintenance programs for all elevating devices.
Elevator Modernization Plan
Elevators requiring modernization were prioritized for scheduling based on their age, failure rate and role as critical systems for accessibility and operations.
Ten critical units have been identified for modernization for the Elevator Modernization Phase I beginning in the 2020/21 academic year. These elevators are located in buildings where there is only one elevator or they are critical to support accessibility, academic and scholarly research and creative activities.
The remaining twelve elevators were slated for modernization in the 2021/2022 academic year.
Phase II of the Elevator Modernization Plan has started but work was impacted by Covid. The schedule was adjusted for the major work to resume in the Spring Term 2022 after Winter Term exams have concluded.
| Building and elevator(s) | Estimated Start |
|---|---|
| Eric Palin Hall (EPH) freight elevator | 唬棗鳥梯梭梗喧梗&紳莉莽梯; |
| Kerr Hall northwest passenger elevator | 唬棗鳥梯梭梗喧梗&紳莉莽梯; |
| Library Building (LIB) - elevator LIB-C-S (#1) | 唬棗鳥梯梭梗喧梗&紳莉莽梯; |
| Library Building (LIB) - elevator LIB-C-SC (#2) | 唬棗鳥梯梭梗喧梗&紳莉莽梯; |
| Jorgenson Hall (JOR) - elevator JOR-SE-E (#1) | 唬棗鳥梯梭梗喧梗&紳莉莽梯; |
| Jorgenson Hall (JOR) - elevator JOR-SE-C (#2) | 唬棗鳥梯梭梗喧梗&紳莉莽梯; |
| Jorgenson Hall (JOR) - elevator JOR-SE-W (#3) | 唬棗鳥梯梭梗喧梗&紳莉莽梯; |
| Victoria Building (VIC) - five passenger elevators |
唬棗鳥梯梭梗喧梗&紳莉莽梯; |
| Building and elevator(s) | Status |
|---|---|
| Civil Engineering Building Monetary Times (MON) | 唬棗鳥梯梭梗喧梗&紳莉莽梯; |
| Eric Palin Hall (EPH) northwest passenger elevator | 唬棗鳥梯梭梗喧梗&紳莉莽梯; |
| Kerr Hall southeast passenger/freight elevator | 唬棗鳥梯梭梗喧梗&紳莉莽梯; |
| Kerr Hall southwest passenger elevator | 唬棗鳥梯梭梗喧梗&紳莉莽梯; |
| Library Building (LIB) passenger elevator #3 | 唬棗鳥梯梭梗喧梗&紳莉莽梯; |
| Library Building (LIB) passenger elevator #4 | 唬棗鳥梯梭梗喧梗&紳莉莽梯; |
| Parking Garage (PKG) | Complete |
| Recreation and Athletics Centre (RAC) | 唬棗鳥梯梭梗喧梗&紳莉莽梯; |
| Rogers Communications Centre (RCC) | 唬棗鳥梯梭梗喧梗&紳莉莽梯; |
| School of Interior Design (SID) | 唬棗鳥梯梭梗喧梗&紳莉莽梯; |
As modernization work is completed on each unit, the Technical Standards and Safety Authority (TSSA) will provide the last step, to ensure it meets safety requirements before the elevator is returned to service.
Questions?
If you have any questions, please contact the Facilities Help Desk at fixit@torontomu.ca or 416-979-5091.
Report a malfunctioning elevator
To report an malfunctioning or out-of-service elevator, contact the Facilities Help Desk at fixit@torontomu.ca or 416-979-5091.